Websites
A Turin website: the spec sheet beats the slogan
In Turin a supplier's site is judged on the spec sheet: 841,600 residents in 2023 (Wikidata), technical buyers, tolerances, lead times.
Key points
- Turin has 841,600 residents in 2023, read from Wikidata on 1 November 2026: it is a mid-size city, not a metropolis.
- The reader is a technician: one page per part number with tolerances, material and lead times beats the home page.
- Certifications belong on the site as documents with a number and an expiry date, not as logos.
- Price ranges are national: €4,000-10,000 for a 15-40 page company site.
A supplier's website in Turin is judged on one thing: whether a procurement office can find the spec sheet without calling. Someone looking for a machined part or a surface treatment does not care how long you have existed, they want material, tolerance and lead time.
The local figure gives the market scale: 841,600 residents in 2023 in the municipality of Turin, read from Wikidata on 1 November 2026, with the Città metropolitana di Torino as the province. That is a mid-size city: less competition on the generic term, more weight on reputation and references.
The reader is a technician
A procurement manager works with a part number, a quantity and a date. If the site does not give those three, they open the PDF catalogue or call another supplier. For a manufacturing company, the difference between a useful site and a decorative one sits in the product page.
| What the buyer looks for | Where it belongs | What is not needed |
|---|---|---|
| Material and tolerances | Product page, one per part number | A corporate video on the home page |
| Certifications | Quality page, with number and expiry | A logo with no document attached |
| Lead times | Product page, with the conditions that change them | «On-time delivery guaranteed» |
| Technical contact | Name, role, direct email | A generic form with no recipient |
| Quote | Part number, quantity, material, required date | A twelve-field form |
Four pages an industrial client actually uses
- Products by family, with a list you can filter by material and use: the entry point for anyone who does not know the part numbers.
- A page per part number, with a dimensioned drawing, tolerances, treatment and units.
- Quality and certifications, with downloadable documents and the expiry date next to each one.
- Quote, with the four fields needed to answer: part number, quantity, material, date.
- Find us, with heavy-vehicle access and loading and unloading hours.
What changes for a company of 50 to 250 people
At that size the catalogue already lives in an ERP, and the site must not duplicate it: it has to publish the public part ahead of it. Three consequences. First, product pages need to be generated from data, not written one by one, or the first new price list makes them obsolete. Second, each product family needs an owner, because one salesperson cannot answer for everything. Third, a customer area with tailored price lists is its own project, not a page of the showcase site.
The cost: national ranges, not Turin ones
A 15-40 page company site in Italy sits between €4,000 and €10,000; a 5-10 page showcase site between €1,500 and €4,000. Those are national ranges, the same ones we publish for every city: our dataset holds no local prices. On a technical catalogue the item that gets missed is generating the product pages and maintaining them, which grows with the number of part numbers.
Three catalogue records
Stats 01 from ephraimduncan is a labelled row of numbers: parts produced, part numbers in the catalogue, years of supply. Feature 01 from Shadcn Space carries three columns of specifications with an icon. The table category holds 13 blocks from 4 publishers and is the one to use for bills of materials, not for marketing numbers. The licence is declared by the publisher and needs checking on the block; previews are free, the full code sits in the Pro plan.
The limitation to state up front
The catalogue holds no PIM, no spec sheet generator and no ERP connector: these are React and Tailwind interface components. Past fifty product pages the problem is the data, not the layout, and it has to be solved before choosing blocks. On WordPress these blocks work as a structural reference, they do not install as they are.
# quante schede prodotto sono indicizzate
curl -s https://www.esempio.it/sitemap.xml | grep -c "/prodotti/"
# la scheda dichiara dati strutturati e un codice
curl -s https://www.esempio.it/prodotti/esempio | grep -c "application/ld+json"
curl -s https://www.esempio.it/prodotti/esempio | grep -o '"sku":"[^"]*"'
The costs item by item are in what a website costs, annual maintenance in what it costs to maintain a site; the agency versus DIY comparison is in agency or DIY.
Frequently asked questions
How much does Turin's size matter for a B2B site?
Less than reputation. Turin has 841,600 residents in 2023, read from Wikidata on 1 November 2026, and it is a mid-size city: buyers of components work on references and samples, not on a keyword. The site confirms what sales has already promised.
How many product pages do I need?
One per part number you sell or make to specification. Under fifty you can write them by hand; above that you should generate them from a single data source, or the first new price list makes them all obsolete. Ten complete pages beat two hundred with only a name.
Are PDF spec sheets needed?
Yes, if clients attach them to an internal order, but the page must carry the same data in HTML: a PDF is awkward on a phone and does not get indexed. Keep the PDF as an export of the page, not as the only format.
What does a manufacturer's website cost?
A 15-40 page company site sits between €4,000 and €10,000 under the national ranges we publish. The item that grows is generating and maintaining product pages, which depends on the number of part numbers, not on the city.
Do I need a customer area with price lists?
Only if prices differ per client and order volume justifies it. It is a project with authentication, roles and an ERP integration, so a different cost from a showcase site. For a handful of clients, a quote request with part number and quantity is enough.